Community Engagement.
-
Workshop 1
Workshop 1 focused on reviewing existing conditions and introducting the project to the Community.
-
Design Charrette - Day 1
Design Charrette Day 1 focused on sharing feedback from Workshop 1 and the On Line Survey. The focus of the meeting was on identifying project Focus Areas and potential solutions (Toolbox).
-
Design Charrette - Day 2
Design Charrette Day 2 focused on applying toolbox solutions to the focus areas. This was the first in person event on the reservation and incorporated both an brief presentation and input opportunities.
-
Online Survey
An online survey was conducted in December 2021 as a follow up to Workshop 1. Results of the survey can be found via the link below.
-
Workshop 2
Workshop 2 focused on reviewing projects and providing feedback on the conceptual design. Due to the Fairview Fire, this workshop was conducted through a series of videos and surveys.
-
Workshop 3
Workshop 3 focused on presenting the elements of the Draft Long Range Transportation Plan including the projects included in the Plan and methods community members can use to submit comments on the Plan.